Gas turbine - control system retrofits
VBR Turbine Partners combines technical expertise with a customer focused approach. VBR has 25 years of experience upgrading control systems for LM6000 and LM2500 turbines.
From minor HMI updates to comprehensive system replacements, we will ensure that your turbine operates at peak performance with minimal downtime. Our work complies with local regulations and is certified to the highest standards.
Speedtronic
Our engineers are experienced working with the following control systems:
- Mark IV
- Mark V
- Mark VI
- Mark Vie
Woodward
Our engineers are experienced working with the following control systems:
- Netcon
- MicroNet™
- MicroNet™ Plus
Why you need a retrofit
Delaying an upgrade reduces performance and leads to operational risks. That’s because over time, control system efficiency declines. Parts become unavailable and the system becomes obsolete.
It’s important to upgrade your control system every 10 – 15 years and HMI software and hardware every 3 – 5 years.
Your control retrofit can include
VBR tailors control system retrofits to your needs. You may want to maintain a familiar operational setup or adopt the latest technologies for better performance. Tell us what works for you. Your control retrofit can include:
Hardware upgrades
Replacement of control cabinets, vibration systems and gas valves.
Upgrade to a Bentley Nevada or VibroSmart vibration systems.
Modernize control system
Change between Speedtronic and Woodward Micronet platforms.
Switch to a more advanced platform like Woodward Micronet+.
Upgrades within the same system.
HMI updates
Install modern interfaces such as AVEVA Plant SCADA.
Upgrade to latest Windows OS and advanced visualization tools.
Custom engineering and testing
Develop new system schematics and configurations tailored to your turbine.
Use proprietary software to test and validate all components.
Factory Acceptance Testing
Collaborate with you to validate the new system before installation
On-site installation and commissioning
Remove old systems and install new hardware, HMI and software
Complete installation and commissioning within 2–3 weeks