Gas turbine relocation
VBR Turbine Partners provides engineering and management support to guide you through the complex turbine relocation process. This process includes preparation, disassembly, transportation and reassembly.Â
We will keep your downtime down. And ensure optimal performance once the turbine is re-installed.
- VBR keeps your downtime down
- GE engines - LM2500, LM6000, LM1600
- We manage the entire relocation process
- Minimal disruption to your operations
Our process includes
A thorough inspection
The relocation process begins with a thorough inspection of the gas turbine while it is still operational at its original location. The engine parameters are reviewed to ensure the gas turbine is in good condition. This helps predict turbine performance after relocation.
Disconnect the gas turbine
After the inspection, the gas turbine is disconnected from its package, along with fuel lines and control systems. The turbine is then carefully removed from the package and placed in a specially designed-shipping container. If needed, VBR can provide customized shipping containers.
Reassembling your gas turbine
After transportation, VBR reassembles the gas turbine and reinstalls it in the new package. Our engineers reconnect fuel lines, electrical systems and control cables. We then install critical components like the air intake, exhaust stack and filtration systems.
Top 3 questions about gas turbine relocation
These are the top 3 questions our customers ask about gas turbine relocation. If you have other questions, contact us.
01Are there restrictions as to where VBR provides relocation services?
Typically, there are no restrictions provided that local governments must permit us under green or orange travel advisories. We strictly follow all regulations and guidelines to have the necessary permits and licenses to work in foreign countries.
02Can VBR relocate a trailer-mounted gas turbine with the trailer and its components?
VBR focuses on relocating the gas turbine and related equipment, such as the power turbine and essential supporting systems. While we are fully equipped to remove, transport, and reinstall the gas turbine itself, we do not handle the complete relocation of the trailer or all components attached to it. Tasks such as moving multiple trailers to a new location or managing non-gas turbine-related equipment fall outside our scope.
03Can VBR transport auxiliary equipment and related parts for gas turbine relocations?
VBR manages the transportation of auxiliary equipment and related parts required for gas turbine relocations. We also provide the manpower to supervise the relocation process and the equipment for handling LM2500 and LM6000 turbines.
VBR ensures that all tools and testing equipment needed during the relocation are available and properly used. Additionally, we offer custom transport containers for sale or lease to ensure the safe and secure transportation of the turbines and their components.